Create a Website Account - Manage notification subscriptions, save form progress and more.
It is not mandatory to connect to the sewer system if it is available to you. You may need to connect if your septic system does not pass the Title V inspection process.
If you wish to connect to the Town’s sewer system, the connection must be done by a drainlayer that is licensed in the Town of Auburn. You may pick up the list of licensed drainlayers at the Sewer Division office or download the list from this site. It is recommended that you obtain quotes from at least three of the drainlayers to get an estimated cost of the sewer connection. The drainlayer will obtain the sewer connection permit from the Sewer Department.
A new connection requires payment of a sewer connection fee to the Town of Auburn. Current fees are available on the Sewer Division homepage. Separate fees apply for residential and commercial buildings. Residential fees are based on the number of bedrooms. Commercial fees are based on the size and used of the building being connected.
Hours
Monday through Friday: 7 a.m. to 3 p.m.